Canada’s canals escape cuts

Good news for Canada’s Historic Canals! The length of the navigation season and the hours of operation of Parks Canada’s historic canals will see little changes in the 2013 season. The length of season will remain the same, with some operational adjustments in the shoulder season. This is very good news for the communities, businesses, … Read more

WCC adopts Groningen Declaration

More than 200 waterway experts, managers and advocates attended the World Canals Conference at Groningen (Netherlands). The full programme of conference sessions with speakers from many countries throughout the world, and the daily site visits, will be reviewed here and in our next newsletter. The first site visit on Monday September 19 took delegates to … Read more

Move for restoration of Locarno-Milan waterway

Claudio Repossi of Navigli Lombardi reports on a series of events to raise awareness of the historic, cultural and recreational values of the Locarno (Switzerland) to Milan waterway via the river Ticino. As part of the joint Italian-Swiss project Intrecci sull’acqua – or Dialogue on the Water – a series of initiatives have been launched, … Read more

‘Regatta’ promotes Serb canals

Radomir  Ječinac  reports from Belgrade, Serbia, on the ‘regatta’ (flotilla cruise) organised on the canals and waterways of Serbia in June/July 2012. Remember IWI’s annual World Canals Conference held in Serbia, in the beautiful city of Novi Sad on the Danube, in 2009? The host, Vode Vojvodine (Vojvodina waters) is an all-important institution in our country, which was founded … Read more

Canal & River Trust launched

The British Government placed 2000 miles of canals and rivers in trust for the nation, as the new charity, the Canal & River Trust, was launched on July 12. The trust takes over responsibility for the canals of England and Wales from British Waterways, 50 years after the British Waterways Board was founded in 1962. … Read more

Canada’s canals reorganized

Dave Ballinger reports on the changes that are taking place on Canada’s historic canals. Parks Canada enjoyed a well deserved reputation in the world as an excellent operator, manager and guardian of Canada’s historic canals. However that is about to change. As part of the incumbent government’s deficit cutting program, Parks Canada seems to have … Read more

End of road for Seine-Nord?

The Seine-Nord canal project is now very close to being abandoned by the French Government, along with the Lyon-Turin rail link and base tunnel and about 15 other sections of the high-speed rail network, promoted in 2010 under the ‘Grenelle’ package of measures for the environment (reported by Les Echos) An ‘excuse’ for abandoning the … Read more

Foodie Afloat book

Congratulations to IWI Council member Di Murrell on winning the prestigious Sophie Coe Memorial Prize for Food History, at the Oxford Symposium for Food and Cookery, on July 7. Her essay entitled ‘Food on the Move’ describes some of the ways in which the working boatmen who used to carry freight on the waterways of England fed themselves and their families. See the essay on her website.

More EU funds for new canal?

The Seine-Nord Europe Canal project is still alive! The proposed Seine-Nord Europe Canal will create a high-capacity freight corridor from Le Havre to northern France, the Benelux countries and the Rhine, for a cost estimated at €4.3 billion, of which €2.1 billion to be funded by a private partner. The selection process with the two … Read more

Lot restoration progress in 2012

In the earlier post on the river Lot we mentioned the elimination of Escambous lock in the navigable length centred on Puy-l’Évêque. This means dredging and rock-blasting to eliminate the weir beside this lock, to provide a navigable channel. The département Lot is now carrying out these works under a four-month contract, at a cost of €750 000. Dredging is also needed in the Floiras and Castelfranc reaches. In all, 5000 m3 of rock and sediment will be cleared to make the channel. Another €1.8m contract for restoration of the 17th century Floiras Lock is nearing completion. The lock-gates are being installed and the lock will be operational this autumn. These works will add about 10km to this navigable secion of the Lot, to make a total of 40 km. Complementary dredging in the Orgueil reach will be undertaken in 2013 to ensure navigability through to Fumel dam.