In the earlier post on the river Lot we mentioned the elimination of Escambous lock in the navigable length centred on Puy-l’Évêque. This means dredging and rock-blasting to eliminate the weir beside this lock, to provide a navigable channel. The département Lot is now carrying out these works under a four-month contract, at a cost of €750 000. Dredging is also needed in the Floiras and Castelfranc reaches. In all, 5000 m3 of rock and sediment will be cleared to make the channel. Another €1.8m contract for restoration of the 17th century Floiras Lock is nearing completion. The lock-gates are being installed and the lock will be operational this autumn. These works will add about 10km to this navigable secion of the Lot, to make a total of 40 km. Complementary dredging in the Orgueil reach will be undertaken in 2013 to ensure navigability through to Fumel dam.
Water conveyors and waterways in Lombardy
A sense of urgency permeates the air in Lombardy as well as in neighbouring Piedmont, Emilia Romagna and Veneto regions, regarding Italy’s network of navigable canals and rivers. What reality will be revealed to the world of inland waterway specialists and advocates, meeting in Milan on September 1st for the 27th World Canals Conference? It … Read more